Municipal Infrastructure

Municipal Infrastructure
Municipal infrastructure

The municipal infrastructure of Sevastopol is represented by systems of drinkable and hot water supply, heat supply, waste water treatment and solid waste disposal.

Heat supply

There are two local enterprises providing residents with heat: the municipal enterprise "Sevteploenergo", and also an LTD Company «SGS Plus» (the Sevastopol heat station).

Approximately 114 district boiler shops function in the city. They basically work with the help of natural gas though there are some boiler shops working on firm and liquid fuel (coal, black oil)

Water supply

The water delivery system has 11 local sources, the main of them is Chernorechensky water basin, 2 auxiliary sources: Vilinsky water scoop together with the Intermountain water basin which is a reserve source, 19 pump stations, 23 hydro systems, 36 wells, 1094,8 km. water pipe grids. Every day the city consumes about 150 thousand cubic metre of water.

Sewerage and water cleaning

Sewage system of Sevastopol counts 9 sewage treatment facilities, 33 sewage accumulating facilities; 589,3 km of sewerage grids.

The technical and domestic waste

There are specially arranged platforms for litter collection in the city, which are served by the housing and municipal enterprises. Here the litter is gathered in containers and then taken out by private companies to the refuse dump. There is also a project of revegetation and decontamination of the 1 map of refuse dump. Execution cost of the project makes 16 million hrn. The total area is planning to be 16 hectares.

The first map (waste storage) makes 3, 5 hectares and has the capacity of 800 cubic meters. It was operated since 2001 for 2008. It has been temporarily laid up; moreover the revegetation hasn"t been made yet.

The second map makes 3, 5 hectares. It has been exploiting since 2006 and filled on 70%